JENGA TANZANIA

Tanzania Hydropower Design Team

UTK Interdisciplinary Senior Design Project – 2025–2026

Real Project. Real Impact. Real Lives Changed.

Sustainable Energy for Tanzania
Mission

Help transform a 50,000‑acre working farm in rural Tanzania into a sustainable, electrified hub for agriculture, clean water, and community health. Design a waterfall‑driven hydroelectric power system to supply the farm and nearby villages — and sell excess power to the national grid.

Why This Project is Unique

  • Real‑World Impact: Your work directly improves lives.
  • Global Collaboration: Work with U.S. & Tanzanian experts.
  • Cutting‑Edge Design: Apply renewable‑energy tech to real terrain.
  • Cross‑Disciplinary: Engineers + business tackle technical and financial challenges together.
Who We're Looking For
  • Electrical & Mechanical Engineering: Power system design, turbine selection, CAD, simulation.
  • Civil Engineering: Hydrology, infrastructure design, transport logistics.
  • Business: Capital planning, economic analysis, commercialization strategy.

Objectives

  • Identify optimal hydro systems from seasonal water‑flow data.
  • Compare power‑production options via trade studies.
  • Model install/operate/maintain costs; calculate cost per kWh.
  • Benchmark vs PV systems and local engineering proposals.
  • Develop a viable business case for implementation.

Impact

Clean Energy

Reliable electricity for farm operations and nearby villages through distributed hydropower.

Health & Nutrition

Supports clinics, safe water, and porridge/food programs that improve family wellbeing.

Economic Growth

Power sales to Tanzania's grid create sustainable revenue and reinvestment capacity.

Apply to Join the Team

Ready to make a real impact? Submit your application below.

Schedule Time with Leonard
Kickoff: Aug 2025Duration: 2 semestersLocation: UTK + remote
Leonard Knight: 865‑384‑6481
Leon Tolbert: tolbert@utk.edu